|
View Out of Roundhouse, Durango, 7-25-60.
Date: 30/04/16
Views: 23744
|
078-01-Coal-Tipple,-Front,-Durango,-7-28-60-v.3-(text)
Date: 30/04/16
Views: 17126
|
Standard Uranium Mining Co. Mill [Mayflower-Mill], Silverton,4-5-62.
Date: 30/04/16
Views: 27776
|
Tramhouse Exterior 1
Date: 30/04/16
Views: 17748
|
|
#495-&-Train-Heading-to-Aztec,-7-27-60-v.2
Date: 30/04/16
Views: 17132
|
Denver & Rio Grande Western Railroad
Date: 30/04/16
Size: 2 items
(46 items total)
Views: 10637
|
Tram Bucket 1.
Date: 30/04/16
Views: 17098
|
#495-Near-Carbon-Jct.,-Durango,-7-27-60
Date: 30/04/16
Views: 21093
|
|
Cables, Arrastra Gulch.
Date: 30/04/16
Views: 17840
|
Colorado & Southern Railway
Date: 28/04/16
Size: 1 item
(16 items total)
Views: 11049
|
077-40-Coal-Tower,-East-Side,-Durango,-7-28-60-v.3-(text)
Date: 30/04/16
Views: 16760
|
Tramhouse Front, Left Side.
Date: 30/04/16
Views: 19127
|
|
#476 at Coal Tipple, Durango, 7-26-60.
Date: 30/04/16
Views: 18483
|
Switching Leadville Yard.
Date: 28/04/16
Views: 25577
|
078-04-Coal-tipple-Loading-Grate,-Durango,-7-28-60-v.3
Date: 30/04/16
Views: 17024
|
Switching Leadville Yard, 08-11-1962.
Date: 28/04/16
Views: 27124
|